2 Chronicles 3:1-2
New American Bible (Revised Edition)
Chapter 3
Building of the Temple. 1 (A)Then Solomon began to build the house of the Lord in Jerusalem on Mount Moriah,[a] which had been shown to David his father, in the place David had prepared, the threshing floor of Ornan the Jebusite. 2 He began to build in the second month of the fourth year of his reign.
Read full chapter
2 Chronicles 3:1-2
New International Version
Solomon Builds the Temple(A)
3 Then Solomon began to build(B) the temple of the Lord(C) in Jerusalem on Mount Moriah, where the Lord had appeared to his father David. It was on the threshing floor of Araunah[a](D) the Jebusite, the place provided by David. 2 He began building on the second day of the second month in the fourth year of his reign.(E)
Footnotes
- 2 Chronicles 3:1 Hebrew Ornan, a variant of Araunah
Scripture texts, prefaces, introductions, footnotes and cross references used in this work are taken from the New American Bible, revised edition © 2010, 1991, 1986, 1970 Confraternity of Christian Doctrine, Inc., Washington, DC All Rights Reserved. No part of this work may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information storage and retrieval system, without permission in writing from the copyright owner.
Holy Bible, New International Version®, NIV® Copyright ©1973, 1978, 1984, 2011 by Biblica, Inc.® Used by permission. All rights reserved worldwide.
NIV Reverse Interlinear Bible: English to Hebrew and English to Greek. Copyright © 2019 by Zondervan.